Home  |  Engineering Standards  |   TOC Waivers

TOC Waivers

PacificNational freight at Parkes

Everyone who works or operates on the Country Regional Network (CRN) is responsible for safety and the integrity of the Network. 

This section contains TOC Waivers for the CRN as issued by the Principal Engineer, Rollingstock.  See also the JHR CRN Train Operating Conditions Manual in the Engineering section of this site.


Ref No. Title Issue Date Effective Date Operator Expiry Date  
16-012  Movement of Perth EMU Cars across the CRN between Bowenfels and Parkes  10 Feb 2016 10 Feb 2016 Pacific National  10 Aug 2016 Download
.pdf (0.08 MB)
16-014  Operation of PHC Class Locomotives for Testing Purposes on the CRN  22 Feb 2016 22 Feb 2016 Crawfords Freightlines  22 Aug 2016 Download
.pdf (0.08 MB)
16-016  Trial Operation of Centennial 5000 tonne Coal Train using WDP between Bowenfels, Lidsdale and Charbon Jn and return  7 Mar 2016 7 Mar 2016 Southern Shorthaul Railroad  7 Jun 2016 Download
.pdf (0.08 MB)
16-017  Change to Permanent Speed Signs on the Bowenfels to Parkes Corridor  23 Mar 2016 29 Mar 2016 All Operators  29 Sep 2016 Download
.pdf (0.18 MB)
16-019  Permitted Increase in the L4 Train Load from The Rock ABA to The Rock  13 Apr 2016 13 Apr 2016 Pacific National  13 Oct 2016 Download
.pdf (0.08 MB)
16-022  Certification Extension of Agile Arbor Road-Rail Mitsubishi Canter Weed Spraying Unit for Operation on the CRN  17 Apr 2016 17 Apr 2016 Agile Arbor  17 Jul 2016 Download
.pdf (0.10 MB)
16-023  Movement of Multiple Locomotive Consists on the CRN  1 May 2016 2 May 2016 Southern Shorthaul Railroad  31 May 2016 Download
.pdf (0.08 MB)
16-025  Change to Permanent Speed Signs on the Werris Creek to Armidale Corridor  13 May 2016 27 May 2016 All Operators  27 Nov 2016 Download
.pdf (0.09 MB)
16-026  Operation of the Fletcher 5000 tonne Intermodal Train with a AC and DC Locomotives  6 May 2016 7 May 2016 Southern Shorthaul Railroad  30 May 2016 Download
.pdf (0.08 MB)
16-027  Change to Permanent Speed Signs on the Bogan Gate North to Tottenham Corridor  15 May 2016 26 May 2016 All Operators  26 Nov 2016 Download
.pdf (0.10 MB)
16-028  Change to Permanent Speed Signs on the Narrabri South Junction to Walgett - Merrywinebone Corridors  20 May 2016 23 May 2016 All Operators  23 Nov 2016 Download
.pdf (0.10 MB)

<< < 1 2 > >>